71 Geomechanics Colloquium - 71. Geomechanik Kolloquium
Cover Pictures - Geomechanics and Tunnelling Heft 5/2022
As part of the modernisation of the railway line between Šentilj and Maribor, the existing Počehovo tunnel will be replaced by a new tunnel. The new double-track tunnel through the Pekel Mountains is around 1530 m long and will be equipped with various safety systems. DSI provided AT - Casing System 114 with squeeze connection, self-drilling Hollow Bar Anchors as well as other ground support products in one line including lattice girders, drill steel, and pumps. Breakthrough on the new Pekel railway tunnel was achieved on 18 August 2022. (photo: DSI Underground)
Im Zuge der Modernisierung der Eisenbahnstrecke zwischen Šentilj und Maribor wird der Tunnel Počehovo durch einen Neubau ersetzt. Der neue zweigleisige Tunnel durch das Pekel-Gebirge ist rund 1.530 m lang und mit verschiedenen Sicherheitssystemen ausgestattet. DSI lieferte neben AT - Rohrschirmsystem, Hohlstabanker sowie Gitterträger, Bohrstahl und Pumpen. Der Durchschlag im neuen Pekel-Eisenbahntunnel erfolgte am 18. August 2022. (Foto: DSI Underground)