The tunneling industry is flourishing around the world. But what about the spoil material? This paper presents the different steps achieved towards an automation of rock selection and aggregate quality assessment for tunnelling to reduce environmental impacts and maximize the use of excavation materials by analyzing and processing TBM muck on-line, inside the tunnel, on the tunnel boring machine.
6 Seiten
25 €
Dieser Artikel ist nicht kostenlos verfügbar. Bitte nutzen Sie die Bestell-Option.